Reserve maintenance

CHF 100.00

To ensure the reliable opening of your reserve emergency rescue parachute, we recommend airing and repacking reserve parachutes every 6 to 12 months (depending on the manufacturer). If the reserve has become damp, it is strongly recommended that it is dried and repacked.

We check and maintain your reserve

To ensure the reliable opening of your reserve emergency rescue parachute, we recommend airing and repacking reserve parachutes every 6 to 12 months (depending on the manufacturer). If the reserve has become damp, it is strongly recommended that it is dried and repacked.

A reserve is an essential part of any paragliding equipment, even if you hope never to need it. However, should an emergency occur, correct and regular maintenance is crucial for it to function properly.

As experienced acro pilots, we know how important a well-functioning rescue parachute is. We therefore attach great importance to correct maintenance and inspection. In addition to the semi-annual or annual airing and packing, a visual inspection and detailed check is an extremely important but often neglected point, especially after a deployment.

In our shop in Wolfenschiessen, we offer maintenance for all emergency parachutes. Whether round, square, Rogallo-type steerable, tandem reserve or base canopie – we are familiar with all systems and offer the right maintenance for your needs.

The following is carried out during maintenance

  • Removal from the harness
  • Airing for 48h
  • Checking for linetwists
  • Visual inspection
  • Repack with new rubbers
  • Compatibility check
  • Installation in the harness

Our rescue parachute packers are SHV certified

Shopping Cart
Scroll to Top